Saturday, August 29, 2020

roof finished, still no NBN

 The roof is finished, the back room is drying out slowly.. Still nothing from TBS about our NotBN service or the phones; If these services were critical to life, we would all be dead by now....I don't know why I am bothering waiting for Telstra..we may just pull the request and seek another solution altogether.. 

Saturday, August 8, 2020

Rainy blues

We had a load of Colorbond roofing dropped into the front garden last week, now we are waiting on the guttering and flashing to arrive along with the roofing guys from Ridgways, and for it to stop raining long enough for them to do the roof! 

The insurance guys came and looked at the interior damage which is worse than we thought, new room lining, carpeting and flooring in part...gunna run into serious money.

Meanwhile back at the network, still waiting on TBS to fix the phones and the proper NBN connection..However, with all the Covid-19 stuff going on, I am not holding my breath..